Quality isn’t a final check. It’s designed into every stage.
From drawing review to despatch, a clear specification gives every check a purpose. We agree what matters to your part, how it will be assessed and which evidence your project needs.
FIG. 01 / MOULDED HOUSINGIllustrative features · not measured results
ISO 9001 certifiedISO 14001 certifiedISO 13485 / Planned
Inspection report / 01
A certified system. A clear scope.
Certification is evidence of a managed system — not permission to leave a part’s acceptance criteria undefined.
VERIFIED
ISO 9001:2015
Quality management
For you, a documented approach to requirements, tool approval, production, inspection and non-conformance. Defined responsibilities and records support repeatable quality assured plastic parts; your agreed drawing and sample remain the acceptance reference.
Citation ISO Certification LimitedObtained / April 2025
VERIFIED
ISO 14001:2015
Environmental management
For you, a managed approach to waste, scrap, material use and environmental improvement. ISO 14001 is a system certification, not proof that an individual product is recycled, carbon neutral or environmentally approved.
Citation ISO Certification LimitedObtained / April 2025
Development / not certified
ISO 13485 — Planned, working towards
As medical and healthcare work grows, we are working towards ISO 13485. We do not currently hold it. Discuss non-invasive housings and components where your own quality system covers the device; do not assume medical-device certification or validation from our ISO 9001 status.
These summaries are not certificate replicas. Request current certificate copies for your supplier review. The expired certificate is not used as current evidence.
Inspection report / 02
Quality at every gate.
One continuous inspection report: what we check, how we check it, and what we keep. The exact plan is agreed against your part and project risk.
GATE / CHECKPOINTREVIEW → RECORD
01
Contract & specification review
What is checked
Agree the drawing revision, critical dimensions and cosmetic standard before manufacture. Identify mating features, loads, environment and any customer-specific approval requirements.
How it is checked
Review CAD alongside the controlled drawing and purchasing specification. Clarify datums, measurement conditions, visible surfaces and acceptance criteria.
Record kept
The agreed specification, drawing revision and inspection requirements form the project reference.
02
DFM & tool design review
What is checked
Review walls, ribs, bosses, draft, gates, cooling and parting lines against function and appearance.
How it is checked
Consider where the part may distort, where a weld line could affect strength and which surfaces cannot carry an ejector or gate mark. Discuss practical measurement access and achievable tolerances before committing to steel.
Record kept
Keep the agreed design changes, tool review decisions and outstanding actions with the project.
03
Incoming material & batch traceability
What is checked
Check that the incoming polymer and colourant match the specified grade and formulation. Identify the batch and any agreed supplier documentation.
How it is checked
Compare material identification with the job requirement, retain batch references and handle material according to its processing needs.
Record kept
Link the material batch reference to production records. Agree the depth of traceability and the documents needed before ordering, especially where a customer needs supplier declarations.
04
Tool trials & first article inspection
What is checked
Inspect first-off parts against the agreed drawing, with particular attention to critical dimensions, fit, finish and visible defects.
How it is checked
Use an inspection method suited to the feature and tolerance. Review parts in the agreed condition and assess assembly where relevant. Investigate variation or distortion before approving a production process window.
Record kept
An agreed first article inspection report can record drawing references, measured results and actions. The scope, sample quantity and reporting format are agreed for your project.
05
Sample approval & limit samples
What is checked
Confirm that trial parts satisfy the intended function and appearance. Agree what counts as acceptable cosmetic variation, rather than asking different people to interpret phrases such as “good finish” after production has started.
How it is checked
Review a physical sample under agreed lighting and viewing conditions. Where useful, establish limit samples for an acceptable surface, colour or mark.
Record kept
Keep sample approval decisions and the reference to an agreed master or limit sample. Approval should identify the revision, material and any exceptions, so subsequent runs have a clear benchmark.
06
In-process production checks
What is checked
Check the defined features during the run, not only at the end. Watch for changes in dimensions, colour, fill, flash and surface appearance as material batches, process conditions and tool behaviour vary.
How it is checked
Agree sampling points and frequency in the inspection plan according to risk and the job requirement. Use the approved process settings and review unexpected variation.
Record kept
Retain the agreed production and check records, including batch identification and any interventions. Sampling supports process control; it is not a claim that every characteristic of every part is measured.
07
Secondary-operation checks
What is checked
Review the output of welding, printing, heat staking and assembly against their own acceptance criteria.
How it is checked
Depending on the job, checks may address weld integrity, print adhesion and position, heat-staked joints or assembly function. Define the test and any destructive sampling before work starts; visual inspection alone may not establish joint performance.
Record kept
Capture agreed operation checks and any reference samples or test outcomes.
08
Final inspection, packing & despatch
What is checked
Review the finished batch against the release requirements, including agreed checks, quantity, identification and protection.
How it is checked
Confirm the agreed final inspection and packing method. Identify batches and any customer labelling requirements.
Record kept
Keep the agreed final inspection, packing and despatch references. Request particular labels, certificates or report formats when quoting so that release evidence matches your receiving process.
09
Non-conformance & corrective action
What is checked
Identify and control parts that do not meet the agreed specification. Establish the affected batch and assess the issue before deciding whether sorting, rework, replacement or another agreed disposition is appropriate.
How it is checked
Investigate the cause using the evidence from material, tool, process and inspection records. Agree the immediate containment and then address the underlying cause.
Record kept
Record the non-conformance, disposition and corrective action as agreed. Any acceptance of a deviation needs explicit customer agreement; it is not permission to silently change the specification.
Inspection report / 03
Recognise the defect. Resolve the cause.
Common moulding defects and how we prevent them. These simplified illustrations explain mechanisms, not a diagnosis of your particular part.
Quality control injection moulding starts with design and process understanding. Similar symptoms can have different causes; material, tooling and processing evidence need to be considered together.
Illustrative / 01
Sink marks
Likely cause
Local shrinkage beneath a thick rib or boss pulls the visible surface inward.
Review wall transitions and rib design, then establish appropriate packing and cooling. A cosmetic limit sample helps distinguish acceptable texture from a visible depression.
Illustrative / 02
Short shots
Likely cause
The cavity does not fill completely because flow, venting or the available process window is inadequate.
Review flow length, wall thickness, gate position and vents. Establish stable fill settings and check the material condition; raising pressure alone may create a different defect.
Illustrative / 03
Flash
Likely cause
Material escapes at a parting line or other tool interface during filling or packing.
Check tool condition, shut-offs and alignment alongside the process settings. Maintain sealing surfaces and avoid a process window that relies on excessive pressure to fill the component.
Illustrative / 04
Warpage
Likely cause
Uneven shrinkage or cooling moves the component away from its intended shape.
Balance wall design, gate placement and cooling. Consider resin behaviour and reinforcement orientation. Check the part in its agreed condition, including relevant mating or assembly features.
Illustrative / 05
Weld lines
Likely cause
Separate flow fronts meet, leaving a line that can affect appearance or local strength.
Review gate position and flow around openings. Manage temperature and venting, and assess the line against the component’s function; some lines cannot be removed without changing the design.
Illustrative / 06
Flow lines
Likely cause
The flow pattern becomes visible as changes in surface appearance or bands.
Review transitions, gate design, material temperature and fill behaviour. Agree cosmetic faces and viewing conditions so that process development targets the surfaces that matter to the product.
Illustrative / 07
Burn marks
Likely cause
Trapped gas or overheating causes local discolouration, often near the end of fill.
Check venting, fill behaviour and material residence conditions. Keep vents maintained and investigate the source of heat or trapped air before trying to conceal a mark through colour.
Illustrative / 08
Voids
Likely cause
Internal shrinkage or trapped gas leaves a cavity that may not be visible on the surface.
Review thick sections, packing and cooling, and dry the material where required. Agree a suitable inspection or test for critical internal integrity; appearance alone cannot prove a part is sound.
Illustrative / 09
Splay / silver streaks
Likely cause
Moisture, volatile material or contamination creates silver-looking streaks on the moulding.
Follow the grade’s drying and handling requirements, check material identity and investigate processing conditions. Keep the material path clean and review the source before changing the surface specification.
Inspection report / 04
Agree the evidence before the run.
Documentation and reporting are available as agreed for your project — not an automatic promise of every document on every job.
Inspection reports
Agree critical features, measurement methods, sampling and the report format. A first article report, routine check sheet and full dimensional study have different scopes.
Material traceability
Specify the batch links and supplier documents you need. Establish availability before ordering; material identification is not the same as independent testing.
Sample approval records
Identify the approved revision, material, finish and any agreed limit samples. Record exceptions explicitly rather than leaving appearance open to interpretation.
Corrective action reports
Agree the level of reporting needed for a non-conformance, including containment, cause, action and evidence of follow-up.
Inspection report / 05
Environmental control is process control.
ISO 14001 supports attention to materials and waste alongside the requirements that make the component fit for purpose.
Reduce avoidable waste by reviewing the design, establishing a stable process and investigating repeated scrap. Regrind is considered only where the specification allows it: resin history, appearance, mechanical requirements and customer approval matter. It is not interchangeable with virgin material by default.
Efficient process settings should deliver acceptable parts consistently, not simply minimise one machine setting in isolation. Local supply can reduce transport distance compared with an overseas route, but a product-specific emissions claim needs evidence. Read our environmental responsibility commitments and include any material or reporting restrictions in your enquiry.
Inspection report / 06
Different sectors. Explicit requirements.
We respond to the project’s agreed needs, without implying sector certifications we do not hold.
Requirement / 01
Medical & healthcare
Customers typically ask for controlled revisions, material evidence and clear change management. We review non-invasive component requirements within your device quality system. ISO 13485 remains planned; discuss any validation or regulatory expectation before selecting a manufacturing route.
Requirement / 02
Automotive
Customers may require defined approval submissions, traceability and structured corrective action. Share the required format, sample scope and customer-specific standards early. Our ISO 9001 certification must not be read as a claim of IATF 16949 certification or automatic approval to a particular OEM.
Requirement / 03
Consumer electronics
Fit, colour, texture, assembly and repeatable visible surfaces often matter together. We review critical mating features and cosmetic zones, agree an approval reference and define relevant checks. Any flame rating or electrical compliance requirement needs the correct material grade and application evidence.
Requirement / 04
Renewable energy
Outdoor exposure, temperature, chemical resistance and assembly reliability can shape the inspection plan. We review the environment and specified resin alongside critical dimensions. Product-level performance or sector approvals need explicit evidence; a general quality certificate does not establish them.
Inspection report / 07
Questions before approval.
Straight answers about certification, inspection and the evidence your purchasing team may need.
01
Are you ISO 9001 certified?
Yes. Apex holds ISO 9001:2015 quality management certification through Citation ISO Certification. It covers a managed system for reviewing requirements, manufacturing and checking work. Request current certificate copies for supplier approval. Certification supports consistency; the drawing and agreed inspection plan still define acceptance for your part.
02
What does ISO 14001 mean for my product?
ISO 14001 covers our environmental management system, not a product-specific environmental label or a measured carbon saving. It supports a managed approach to waste, material use and process improvement. Resin selection, regrind permission and any environmental evidence for your product must be agreed against its specification.
03
Do you offer first article inspection?
Yes, first article inspection can be agreed for your project. Send the controlled drawing, critical features, required report format and sample quantity with your enquiry. We will review measurement methods and approval requirements before quoting. A dimensional report and a functional assembly check may need different arrangements.
04
How do you control colour and cosmetic quality?
Agree a colour reference, visible faces, finish and physical approval sample. Limit samples can make permitted variation clearer. Resin, pigment, wall thickness, texture and lighting all influence appearance. Define the viewing conditions and any measurement requirement; a screen image or RAL code alone is not a complete acceptance standard.
05
What happens if parts are out of specification?
We review the issue against the agreed requirement, identify affected work and establish appropriate containment. Disposition and corrective action depend on the evidence and your agreement. Share the drawing revision, batch reference and details of the defect so that investigation can focus on the cause rather than an unexplained symptom.
06
Can you provide material certificates and traceability?
Material batch traceability and available supplier documents can be agreed for your project. Tell us the exact grade, declarations and record format you need before manufacture. Availability depends on the material supplier and scope. A supplier declaration, batch record and independently tested material certificate are different forms of evidence.
07
Do you manufacture medical device components?
We can discuss non-invasive housings and components where your own quality system covers the device. Apex does not currently hold ISO 13485; certification is planned and we are working towards it as medical and healthcare work grows. Do not treat ISO 9001 as equivalent to a medical-device quality certification.
08
How do you prevent sink marks and warpage?
Prevention starts with balanced walls, suitable ribs and bosses, gate placement and cooling during DFM and tool design. Material selection and controlled packing and cooling remain important during trials. We review results against your drawing and cosmetic requirements; process changes cannot always compensate for a geometry that needs redesign.
Inspection report / 08
Carry the specification forward.
Connect inspection requirements to the manufacturing route, material choice and transfer plan.
PROJECT REVIEW / NEXT ACTIONFOR REVIEW
Send the drawing. Define the standard.
Send your drawing with critical dimensions and cosmetic standard — we’ll propose an inspection plan with your quote.
Include the revision, material, quantity and any reporting or sample-approval requirements. If you are transferring an existing tool, send the approved samples and available inspection history too.