Skip to content
Call usGet a quote

THE PROCESS ATLAS / APEX MANUFACTURING

Plastic manufacturing services UK

From the first prototype to the packed product, connect the right processes around your part.

Get a quote

ISO 9001 & ISO 14001 certified
UK-managed · Part of Clowsley Industries

PROCESS ATLAS / UK MANUFACTURING
01—06 / ONE CONNECTED ROUTE

Prototype. Tool. Manufacture. Finish.

ROUTE FINDER

Which process fits your part?

Start with demand, shape and design maturity. As a contract plastics manufacturer, we look at the finished part’s requirements—not just one operation’s price.

parts
1 part500,000+
Part size
Geometry
Design stage

RECOMMENDED STARTING POINT

Injection moulding

A stable design and repeatable volumes favour a mould, especially for integrated clips, bosses and ribs.

Tooling approach

Consider aluminium tooling for lower volumes.

The trade-off

Tooling requires upfront investment and approval trials before production.

An initial process guide, not a quotation. Material, tolerances and CAD review may change the recommendation.

01

PROCESS / 01

Injection moulding services

Repeatability begins with the part design, not with the first production cycle.

Schematic housing with draft, ribs, screw bosses and a consistent wall sectionEVEN WALLSSCREW BOSSESRIBS, NOT BULKDRAFT FOR RELEASE

Design intent → repeatable moulded detail

Explore injection moulding

When a mould earns its place

Injection moulding fills a closed tool with molten polymer, then cools and ejects the part. It suits stable designs that need repeatable detail: housings, clips, brackets, closures and components with integrated ribs or bosses. Low, medium and high volumes call for different tooling choices; the cheapest tool is not necessarily the lowest-cost route over the product’s life.

From sample to repeat production

Sampling and pre-production trials establish whether the tool, material and process produce an acceptable part before scale-up. Critical dimensions, fit and visual requirements need agreement at drawing stage. Tight tolerances are feature-specific: shrinkage, warpage and measurement conditions matter. Approve a representative sample and inspection criteria rather than relying on a blanket tolerance promise.

Cavities, cooling and cycle time

A single cavity can limit initial investment and simplify early changes. Multiple cavities increase output per cycle, but add tooling cost and demand balanced filling and consistent cooling. Wall thickness, material, cooling, tool actions and ejection all influence cycle time. Uniform walls and sensible rib sections help avoid sink and unnecessary cooling time.

Control and handover

Apex manages the design review, tooling specification and route into production; offshore tool-build options can be considered for high-volume tools. Material selection should reflect temperature, impact, chemical exposure and appearance. Handover should include approved samples, agreed inspection requirements and packing details, with secondary operations scoped before ordering. See the materials guide before fixing a polymer on price alone.

02

PROCESS / 02

Mould tooling: buy the life you need

Match tool material, cavity count and finish to a credible demand forecast.

MATERIAL / 01

Aluminium

Prototype / short run

Faster to cut and easier to modify, but wears faster. Useful for proving a design and lower-volume production; material abrasiveness and geometry still need review.

MATERIAL / 02

P20 steel

Pre-hardened / medium volume

A pre-hardened option for repeat production where tool life, machinability and initial cost need balancing. Specify the finish and expected use rather than choosing by grade alone.

MATERIAL / 03

H13 steel

Hardened / high volume

Consider for long production life and demanding materials, including glass-filled polymers. Hardening and machining requirements belong in the tool specification and build plan.

MATERIAL / 04

Stainless steel

Corrosion / high polish

Useful where corrosion resistance or a high-polish surface drives the selection. Polymer chemistry, cosmetic expectations and maintenance all inform the grade and finish.

DFM before metal is cut

Draft, parting lines, gating, wall sections and undercuts determine how complicated a tool becomes. Removing an unnecessary side action or simplifying an inaccessible feature can reduce investment and processing waste without changing the part’s purpose. UK-managed tooling gives one agreed specification whether the build is local or offshore.

Your tool. A documented approval.

You own the tool once it is paid for. T1 samples are an approval stage, not automatic permission for a full run: inspect dimensions, fit and finish, resolve changes and record sign-off. Existing-tool transfers begin with a condition and compatibility review, including documentation and any repair needs.

Explore tooling optionsCompare mould tool materials
03

PROCESS / 03

Vacuum forming services

Think in sheet, draw depth and trim lines—not simply a larger injection-moulded part.

Where a formed shell makes sense

Vacuum forming heats thermoplastic sheet and draws it over a tool. It is a useful route for thermoformed trays, guards, housings, enclosures and panels, particularly where a large open shape would make an injection tool difficult to justify. HIPS, ABS, PETG and HDPE offer different balances of rigidity, appearance and service performance; choose against the actual environment.

Forming and finishing are one specification

Draw depth, corner radii, draft and sheet thickness affect material distribution. Deep draws can thin the walls, while tight detail may not reproduce as expected. Define the trim line, flange, cut-outs and mating surfaces early. Trimming, CNC finishing, drilling and bonding turn a formed shell into a usable component, so their fixtures and acceptance criteria belong in the original quote.

Explore vacuum forming
DEVELOPMENT TOOL

MDF, tooling board or epoxy

These tool routes can suit development and appropriate shorter runs. Surface finish, heat exposure and repeated use affect their suitability. Foam or tooling-board concepts should be checked against the required forming conditions, not assumed to have production-tool durability.

REPEAT PRODUCTION TOOL

Aluminium

Aluminium can support repeat use and controlled thermal behaviour. Tool cost must be considered alongside the finished part, trim operations and expected demand. Apex manages tooling and the forming-to-finishing route; handover should agree the approved formed sample, trim drawing, material and packing requirements.

Compare forming tool materials
04

PROCESS / 04

3D printing prototypes & bridge parts

Learn from a physical part before you commit to a production tool.

Prototype with a specific question

Additive manufacturing builds a part layer by layer without a dedicated mould. Form-and-fit prototypes can test access, assembly clearances and handling before the design is frozen. Choose a print process and material for the question being tested: a visual model is not automatically evidence of strength, heat resistance or moulded-part performance.

Bridge the gap to production

Printed bridge parts can support development while tooling is cut, provided their limitations are understood. Jigs and fixtures are another useful application: a low-volume aid can make repeat assembly or inspection easier without a separate mould. Orientation, supports, layer direction and post-processing influence dimensions, strength and surface quality.

Keep the production route in view

Apex helps connect the prototype requirement to the later manufacturing route rather than treating a print as the final design authority. Ask for the material, build assumptions and finishing scope to be agreed at handover. Check the eventual moulding or forming design rules before carrying every printed feature into production; see launching a product for the wider route.

Explore additive manufacturing
05

PROCESS / 05

Plastic assembly services

The part is only finished when it is ready for the next person in the supply chain.

Secondary operations connect individual components to a market-ready product. Plan joining, marking, inspection and packaging with the primary process, not after the first batch arrives. Apex’s assembly scope can include customer-supplied components; define their availability, traceability and acceptance requirements alongside the parts being manufactured.

  1. 01

    Join

    Ultrasonic welding, heat staking and bonding need suitable joint geometry and material compatibility. Specify joint strength and appearance; a method that holds a sample together is not enough to establish production acceptance.

  2. 02

    Mark & assemble

    Pad printing adds identification or branding. Agree artwork, colour, location and durability requirements. Assembly drawings, fixtures and work instructions should make component orientation and fastening repeatable, including any bought-in items.

  3. 03

    Inspect & pack

    Inspection should check agreed dimensions, function and visual standards. Packing can be bulk, individual or a defined finished-product arrangement. Confirm labels, quantities and protection so parts leave the building ready for their intended market route.

Explore secondary operations & assembly
06

PROCESS / 06

Reshoring manufacturing management

Transfer the knowledge and approval standard—not just the steel.

Before the move

Bringing an existing programme to the UK starts with ownership, tool condition and supply continuity. Gather drawings, material specifications, approved samples, tool records and quality requirements. Compare total landed cost rather than only the supplier’s part price: transport, stock exposure, quality and management effort change the decision.

After the move

Apex manages the transfer review, tooling assessment, trials and route to approval. Check press compatibility and any refurbishment before committing the changeover. A transferred tool still needs sampled parts and agreed inspection: previous production elsewhere does not remove the need to establish a controlled UK process.

Handover without assumptions

Agree responsibilities for supplier exit, freight, repairs, bridging stock and release into production. The handover should retain the approved product standard, not substitute an undocumented “equivalent”. If the real requirement is extra output rather than a full move, compare adding manufacturing capacity before choosing a transfer.

Plan your reshoring routeExplore managed tool transfers

TRANSFER CHECKPOINTS

  1. 01Ownership & records
  2. 02Condition & compatibility
  3. 03Transfer & refurbishment
  4. 04Trials & sample approval
  5. 05Controlled UK production

COMPARE THE ROUTES

Three processes. Different trade-offs.

These are qualitative comparisons, not guaranteed lead times or prices. The right route depends on the actual design, material and order pattern.

Injection moulding, vacuum forming and 3D printing comparison
Decision factorInjection mouldingVacuum forming3D printing
Tooling investmentHigher upfront; shared across repeat ordersGenerally simpler tooling than injection mouldingNo dedicated mould; build preparation still needed
Unit cost at volumeStrong economies once tooling is amortisedInclude sheet usage, trimming and assemblyBuild time remains significant as quantities increase
Time to first partsTool design, build and trials before first approved partsTool preparation, forming trials and trim developmentNo mould build; printing and finishing still take time
Ideal volume bandStable designs; repeat low, medium and high volumesLow-to-mid volumes of suitable shells and panelsPrototypes, changing designs and bridge parts
Part sizeDetailed components and housings; check feasibilityLarge trays, covers and panelsDepends on process and build envelope
Geometric complexityIntegrated ribs, clips and bosses; undercuts need planningOpen shells; detail limited by draw and sheet thicknessComplex forms; supports and orientation affect results
Surface finishTexture, polish and moulded detailSheet finish and texture; trimmed edges need attentionProcess-dependent texture; finishing may be required
Material rangeCommodity and engineering moulding polymersFormable sheet including HIPS, ABS, PETG and HDPEProcess-specific filaments, resins and powders

Injection moulding

Tooling investment
Higher upfront; shared across repeat orders
Unit cost at volume
Strong economies once tooling is amortised
Time to first parts
Tool design, build and trials before first approved parts
Ideal volume band
Stable designs; repeat low, medium and high volumes
Part size
Detailed components and housings; check feasibility
Geometric complexity
Integrated ribs, clips and bosses; undercuts need planning
Surface finish
Texture, polish and moulded detail
Material range
Commodity and engineering moulding polymers

Vacuum forming

Tooling investment
Generally simpler tooling than injection moulding
Unit cost at volume
Include sheet usage, trimming and assembly
Time to first parts
Tool preparation, forming trials and trim development
Ideal volume band
Low-to-mid volumes of suitable shells and panels
Part size
Large trays, covers and panels
Geometric complexity
Open shells; detail limited by draw and sheet thickness
Surface finish
Sheet finish and texture; trimmed edges need attention
Material range
Formable sheet including HIPS, ABS, PETG and HDPE

3D printing

Tooling investment
No dedicated mould; build preparation still needed
Unit cost at volume
Build time remains significant as quantities increase
Time to first parts
No mould build; printing and finishing still take time
Ideal volume band
Prototypes, changing designs and bridge parts
Part size
Depends on process and build envelope
Geometric complexity
Complex forms; supports and orientation affect results
Surface finish
Process-dependent texture; finishing may be required
Material range
Process-specific filaments, resins and powders

FROM SKETCH TO SHELF

A part’s journey, not a supplier list.

An illustrative housing project might follow this route. Each approval carries the design forward; not every project needs every step.

  1. 01

    Concept

    Project review

    Define function, environment and demand before choosing a process.

  2. 02

    DFM

    Design review

    Resolve walls, draft, joints and critical features in the intended material.

  3. 03

    Print prototype

    3D printing

    Check fit and assembly; record what the prototype does not prove.

  4. 04

    Build tool

    Tooling

    Approve the tool specification, material and cavitation before manufacture.

  5. 05

    T1 samples

    Tool trials

    Inspect and agree changes before releasing the design to production.

  6. 06

    Production

    Injection moulding

    Run the approved part and process against agreed acceptance criteria.

  7. 07

    Assemble & pack

    Secondary operations

    Join, mark and inspect the product; pack to its delivery specification.

  8. 08

    Delivery

    Project handover

    Retain the agreed product, inspection and packing requirements for repeat orders.

APPLICATIONS / SECTORS

The function sets the brief.

01

Renewable energy

Equipment housings, brackets and protective components, with exposure and service conditions specified.

02

FMCG

Closures, handles and assembled consumer-product components designed around repeated handling.

03

Toys & sporting goods

Moulded parts and assemblies where fit, finish and intended use guide material choice.

04

Healthcare & medical

Non-invasive housings and components against agreed requirements; ISO 13485 is planned, not held.

05

Building & construction

Covers, fixings and panels with installation, durability and environment considered.

06

Consumer electronics

Enclosures and interface components with assembly clearances and cosmetic standards defined.

07

Automotive

Housings, brackets and trim concepts where drawing requirements determine process suitability.

08

Industrial

Guards, trays, jigs and equipment components built around their working environment.

Based at 12 Canons Road, Old Wolverton, Milton Keynes MK12 5TL. Review our quality certifications and company background alongside the technical scope.

ENGINEERING QUESTIONS

Before you choose a process.

01

What's the difference between injection moulding and vacuum forming?

Injection moulding fills a closed mould with molten polymer and can integrate clips, bosses and ribs. Vacuum forming draws heated sheet over a tool, making it well suited to trays, panels and open shells. Compare geometry, annual demand and total cost, including trimming and assembly, rather than choosing on tooling price alone.

02

How much does an injection mould tool cost in the UK?

The cost depends on part size, geometry, cavities, tool material, surface finish, side actions and the required production life. A design review can identify features that add unnecessary complexity. Send CAD and your target annual volume so we can specify the tool and separate tooling investment from the part price.

03

Can you take over an existing mould tool?

Yes. We assess its condition, documentation, ownership and compatibility before agreeing a transfer. Trial parts and inspection are needed before production approval. Repairs or modifications may be necessary; these should be understood before moving ongoing supply.

04

Do I own the tooling?

Yes. Once paid for, the tool is your property. Agree storage, maintenance and any transfer requirements when ordering, and keep the approved tool specification and sample records with your product documentation.

05

What minimum order quantities do you work to?

We work from one-off prototypes to 500,000+ parts a year, but there is no single economical batch size for every process. Material, set-up, tooling and secondary operations all affect the choice. For smaller prototype requirements, ask about 3D printing before committing to production tooling.

06

What files do you need for a quote?

Send a STEP file where available, plus a dimensioned drawing with critical tolerances, target annual volume, order quantity and material if known. Include finish, colour, assembly and packing requirements. If CAD is not ready, share a sketch and describe the function; we can discuss what is needed next.

07

Can you assemble and pack the finished product?

Yes. Secondary operations can include ultrasonic welding, pad printing, heat staking, bonding, assembly, inspection and packing. Supply the assembly drawing, bought-in component details, acceptance criteria and packaging specification so these operations are included in the project scope.

08

Do you offer design for manufacture support?

Yes. DFM considers the proposed process, material, wall thickness, draft, ribs, joining features and inspection requirements before tooling decisions are finalised. The aim is to make the part repeatable without paying for avoidable tool complexity or unnecessary processing.

PUT YOUR PART ON THE MAP

Send the part.
We’ll connect the process.

Send us a STEP file, target annual volume and material if known—an engineer replies, not a sales script.

Include critical dimensions, finish, assembly and packing requirements. If the design is still developing, tell us what you need the first parts to prove.

sales@apex-manufacturing.co.uk