01 / BELOW THE WATERLINE
The quote isn’t the cost
A factory price measures the part at one point in its journey. Your business pays for the whole journey, including the time and uncertainty between placing an order and receiving usable stock.
REGISTER / 12 EXPOSURES
01
Freight & fuel surcharges
A shipment quote is not a stable unit cost: fuel adjustments and urgent air freight can change the economics after the order is placed.
02
Duty & customs brokerage
Import duty, clearance fees and the work of supplying customs documents sit outside the ex-factory price and need their own budget.
03
Currency swings
An exchange-rate movement between quotation and payment can erase a price advantage unless the exposure is understood and managed.
04
Inventory & tied-up cash
Parts in transit and safety stock consume working capital before they are available to sell or use in your assembly line.
05
Minimum order quantities
A large minimum batch can turn a low unit price into excess stock, especially when a design revision or demand change arrives.
06
Quality escapes on arrival
A defect discovered after a long journey leaves less time to recover and may affect an entire shipment rather than a small release.
07
Rework & returns
Sorting, repair, replacements and the logistics of returning goods draw on people and money that the original quote did not include.
08
Time-zone communication lag
A question that misses the supplier’s working day can hold up a decision, particularly when several technical approvals are needed.
09
Travel for audits
Flights, accommodation and time away from the business should be included when supplier visits are necessary to qualify or resolve production.
10
IP risk
Design information and tooling access need clear agreements; a cheaper purchase price does not substitute for control of your manufacturing assets.
11
Tool access & control
An unclear ownership record or release agreement can make moving a mould more difficult precisely when your supply depends on it.
12
Carbon footprint
Long-distance transport adds an environmental consideration that belongs in the sourcing decision, even when it is not assigned a pound value.
Use your own figures to compare recurring annual costs. Start with annual usable demand, then include the freight, stock finance, reject replacement and extra administration that sit beyond the supplier’s quotation.
Blank fields are not assumed to be free. Enter zero only where an item genuinely does not apply. This is a decision aid for a first review, not an instant manufacturing estimate.
COST MANIFEST / GBP / ANNUAL USABLE DEMAND
COMPARISON / SAME USABLE DEMAND
Enter every assumption to compare; use 0 for costs that do not apply.
Offshore
— / usable part
— per year
UK
— / usable part
— per year
Assumptions are yours — this is a planning tool, not a quote.
Calculation basis & exclusions
Annual usable units ÷ (1 − reject rate) gives purchased units. Goods cost is purchased units × price. Offshore freight is cost per shipment × annual shipments; duty is applied to goods plus freight. Stock finance is the annual goods value (plus freight and duty offshore) × weeks held ÷ 52 × annual capital rate. Offshore administration is extra annual hours × your hourly value. Totals are divided by annual usable units.
UK freight is assumed included in your UK unit price. Prices are compared excluding recoverable VAT. Duty is a simplified planning allowance, not customs advice. The model excludes tooling, recovery, inspection, refurbishment, travel, currency hedging, storage charges and extra rework beyond replacement rejects. Add these separately; assess IP and supply risks alongside, not inside, the total.
All fields need an entry. Demand and shipments must be whole numbers; demand must exceed zero. Rejects must stay below 100%, duty and capital at or below 100%, stock at or below 520 weeks. Negative and non-finite values are not calculated.
03 / RETURN MANIFEST
The reshoring programme
To move injection moulding from China to UK production, or transfer from another overseas source, organise the handover as a controlled manufacturing project. Each phase needs evidence, a responsible contact and a clear release decision.
01
MANIFEST 01 / RETURN PROGRAMME
Discovery & landed-cost baseline
WE MANAGE
We review parts, demand and sourcing. Bringing manufacturing back to the UK must improve the whole supply position, not simply beat a factory quotation.
YOU PROVIDE
Send the part register, drawings, annual demand, current prices, freight records, reject history and stock profile. Separate known costs from estimates so the comparison has an honest baseline.
RISK TO CLOSE
Keep one-off recovery costs separate from repeat production. An incomplete baseline can make either route artificially attractive.
02
MANIFEST 02 / RETURN PROGRAMME
Supplier exit & supply bridge
WE MANAGE
We plan last-time buys, bridging stock and the incumbent’s final production. Release dates follow qualification, not a hopeful shipping date.
YOU PROVIDE
Share current stock, open purchase orders, demand peaks, contractual notice requirements and the contacts authorised to agree tool release. Identify parts that cannot tolerate a supply interruption.
RISK TO CLOSE
Agree responsibilities and bridging stock before exit discussions affect supply. Retain the incumbent route until the replacement is ready.
03
MANIFEST 03 / RETURN PROGRAMME
Mould tool recovery
WE MANAGE
We coordinate tool identification, release documentation, transport preparation, shipping and insurance. The asset register connects each mould to its parts.
YOU PROVIDE
Provide proof of ownership, purchase records, tool drawings where available, photographs, dimensions, weight and the supplier’s release agreement. Include spare inserts, fixtures and maintenance records in the collection brief.
RISK TO CLOSE
Resolve missing paperwork, unpaid balances and ownership disputes before booking transport. A recovery plan cannot replace legal rights to the tool.
04
MANIFEST 04 / RETURN PROGRAMME
Inspection, refurbishment or re-make
WE MANAGE
We assess condition and press compatibility, then agree maintenance, adaptation, refurbishment or replacement. Historic output is evidence, not proof of present condition.
YOU PROVIDE
Send last-good samples, cavity information, steel or aluminium specification, hot-runner details, moulding records and known faults. Flag any modifications made since the original drawings were issued.
RISK TO CLOSE
Wear, damage or incompatible connections can change the scope. Agree corrective work and approval before scheduling production.
05
MANIFEST 05 / RETURN PROGRAMME
UK trials & sample approval
WE MANAGE
We trial tooling and material, inspect samples and record approval decisions. Appearance, dimensions, function and assembly fit belong in the specification.
YOU PROVIDE
Provide current revisions, critical dimensions, acceptance criteria, colour references and mating components. Nominate the person who can approve samples and any permitted deviation in writing.
RISK TO CLOSE
Resolve material and specification differences explicitly. An informal match to an old sample does not establish performance in use.
06
MANIFEST 06 / RETURN PROGRAMME
Steady-state UK production
WE MANAGE
After approval, we establish repeat production, secondary operations and scheduled call-offs in Milton Keynes, with a defined revision, approved reference and delivery requirement.
YOU PROVIDE
Confirm forecasts, firm release quantities, packing, labels, delivery locations and the change-control process. Include assembly instructions and bought-in component responsibilities where a finished product is required.
RISK TO CLOSE
Keep revisions, stock and demand changes visible after transfer. A successful first batch does not remove ongoing planning risk.
04 / EXCEPTION REGISTER
What usually goes wrong
The highest-risk assumptions are often the ones nobody wrote down. Close them before the tool moves, then keep them visible through trials and approval.
Risk
Why it happens
How we mitigate
HOLD 01Supplier withholds the tool
Ownership or release terms are unclear, or commercial balances remain disputed.
Check ownership evidence and release permission before the exit is announced; agree a documented collection scope.
HOLD 02Tool arrives worn or damaged
Maintenance history is incomplete or transport protection is inadequate.
Inspect condition, specify packing and insurance, and allow a decision gate for refurbishment or replacement.
HOLD 03No drawings or process data
The previous supplier held the only usable manufacturing records.
Build a controlled specification from available CAD, last-good samples and functional requirements; agree what still needs validation.
HOLD 04Material grade unavailable in the UK
An overseas trade name or locally supplied grade does not map directly to a UK source.
Check grade availability before transfer and qualify any proposed alternative against performance, appearance and compliance needs.
HOLD 05Stock-out during transition
Last-time buys end before trials, correction work and approval are complete.
Plan bridging stock against the actual qualification sequence and retain a viable supply route until the UK release is approved.
HOLD 06Colour mismatch
A colour name alone does not define the surface, resin or agreed reference.
Use a physical master and RAL reference where appropriate; approve the colour in the specified material and finish. Review RAL colour matching and materials.
05 / DISTANCE REMOVED
Beyond cost. Closer to control.
Supply chain resilience is not a label on a purchase order. It is the ability to see a problem, make a decision and act before the next delivery becomes a crisis.
Shorter supply loops
UK production removes an overseas freight leg from repeat supply. The achievable lead time still depends on material, scheduling and the part, but there are fewer distant handovers to manage.
Smaller releases, less exposure
Discuss batch sizes and scheduled call-offs against real demand rather than filling a shipment by default. Lower stock is useful only when the replenishment plan remains dependable.
Engineering changes with context
Drawings, samples and tool decisions can be reviewed with the people managing production. Agree revision control before a change is released so obsolete stock and old settings do not follow it.
A team you can visit
In-person reviews in Milton Keynes help resolve questions that are difficult to judge from photographs. Bring mating components and the approval specification, not just an example of the problem.
UK quality control & traceability
Define inspection and acceptance requirements within a controlled supply route. Our ISO 9001 and ISO 14001 certifications support that framework; your product requirements still need their own qualification.
A shorter transport route
Removing long-distance repeat freight can reduce transport-related emissions. Review the full sourcing picture rather than claiming a guaranteed carbon saving; see our environmental approach.
06 / ROUTE OPTIONS
Not every part has to make the same journey
Reshoring and nearshoring decisions work best at part-family level. Rank supply risk, demand variability and engineering change needs before moving an entire catalogue.
FULL RETURN
Full reshore
Move the qualified part family to UK production where one local route makes sense. Plan recovery and approval together, then include finishing, inspection and packing in the delivered-part scope.
SPLIT MANIFEST
Reshore the critical SKUs
Prioritise short-lead or interruption-sensitive parts while commodity items remain offshore. Keep a separate stock and revision plan for each route, and qualify any second-source capacity before relying on it.
UK CONTROL
Offshore tool build, UK production
A UK-managed offshore tool build can remain appropriate for high-volume tooling, with inspection and trials here. Compare that one-off investment separately from repeat parts; review the tooling route before placing an order.
Is it cheaper to manufacture in the UK than China?
Sometimes, but not on every part and not by comparing factory prices alone. Compare offshore vs UK manufacturing cost using the same annual demand, reject assumptions, stock exposure and finished-part scope. Freight, duty and extra administration can narrow a unit-price gap; tool recovery and qualification add one-off costs. We make those differences visible rather than promise that every reshore saves money.
02
How do I get my mould tools back from an overseas supplier?
Start with ownership evidence and the contract governing tool release. Identify the mould, confirm any outstanding balances and agree access, packing, shipping documents and insurance before collection. Include spare inserts and fixtures. Apex can coordinate a managed transfer, but disputed legal ownership must be resolved by the parties and their advisers; booking freight alone cannot secure the asset.
03
How long does reshoring take?
The programme depends on supplier cooperation, transport, tool condition, material availability and the approval work your part requires. A serviceable tool with complete records follows a different path from a damaged mould that needs refurbishment or a re-make. We establish the sequence after review and agree the stock bridge around it. There is no universal delivery date that responsibly covers every transfer.
04
Will my existing tools run in the UK?
That needs an assessment, not an assumption. Tool dimensions, clamping requirements, ejection, cooling, electrical connections, runner system and condition all affect compatibility. Share the tool record and last-good samples first. Inspection and trials establish whether the mould can transfer as it is, needs adaptation or is better replaced; repeat production follows your agreed sample approval.
05
What are the hidden costs of offshore manufacturing?
Freight, fuel surcharges, duty, customs work, currency movements, stock finance, minimum batches, reject handling, communication and supplier visits can all sit outside a unit quotation. Tool access, intellectual property and environmental impact may also matter without a simple price tag. Use the iceberg register to identify exposures and the calculator to compare the items you can quantify, then review the remaining risks separately.
06
Can you keep supply going while we transition?
We plan continuity through last-time buys, bridging stock and a staged qualification route. The achievable plan depends on your demand, existing stock and the incumbent supplier’s cooperation. Do not end the current supply before an approved alternative is ready. Share the parts that are critical to your line so stock and timing decisions reflect the consequences of interruption, not just average annual demand.
07
Do you build tools offshore and mould in the UK?
Yes, UK-managed offshore tool-build options are available where that route makes commercial sense, particularly for high-volume tooling. Apex specifies and manages the build, then inspects and trials the tool in the UK before moulding here. It is a different decision from keeping production offshore: compare the one-off tool investment separately from ongoing part supply and agree ownership, approval and support responsibilities.
08
What is landed cost?
Landed cost combines the purchase price with the costs of getting usable parts to the place you need them. A sourcing comparison can extend that view to stock finance, rejects and administration. The calculator shows its planning assumptions explicitly; it is not a customs valuation, a quotation or a complete total-cost-of-ownership assessment. Add any project-specific costs that sit outside its model before making a purchasing decision.