“We launched quicker than we estimated with Apex. From CAD to manufacture in one quarter.”
UK mobility stealth start-up
UK-MANAGED TOOLINGISO 9001 & ISO 14001MILTON KEYNES
01 / THE BRIEF
Different starting points. One controlled route to launch.
FOUNDER / FIRST PRODUCT
Your first hardware start-up
You have a promising concept and a date to work towards, but not every manufacturing decision is settled. The usual trap is ordering a tool to make the product feel real before the design is ready.
We start with function, demand and the questions a prototype must answer. DFM comes before tool commitment; the first batch is considered alongside repeat demand so your start-up manufacturing partner does not specify a lifetime of tooling for an unproven launch.
BRAND / NEW SKU
A new product in an established range
Your brand already has customers, packaging standards and a supply chain. A new SKU must fit them. The trap is reviewing the new housing in isolation, then discovering it does not assemble, label or pack like the existing range.
Bring mating components and the complete delivery requirement. We connect sample approval to inspection, secondary operations and packing, so product launch manufacturing is scoped around what reaches your customer, not just what leaves the mould.
DESIGN TEAM / HANDOVER
A consultancy handing over to manufacture
The design intent is clear, but responsibility is moving from the design team to production. The trap is handing over a model without its critical dimensions, cosmetic zones or approval history.
We tie the tool specification to a controlled revision and explicit acceptance criteria. Your design team stays involved at the right gates, while the manufacturing route gives the client a clear view of what is approved and what still needs a decision.
02 / DRAWING PACK
The launch roadmap
Eight stage gates. Each one closes a question before the next investment. Your project may revisit a stage; an approval is a decision, not simply a date on a chart.
01SHEET 01 / 08 · REV A
Brief & NDA
You send
Your concept, CAD if available, intended use, first-year volume and target launch date. Flag confidential information before sharing it.
We do
Agree the brief, establish what is known and what still needs proving, and arrange an NDA where required. Identify the people who can approve design and commercial decisions.
You receive
A defined starting point, an agreed scope for the next review and a list of missing information.
APPROVAL GATE
Agree the product requirement and permission to review the design.
Risk avoided: Starting with different assumptions about what the product must achieve.
02SHEET 02 / 08 · REV A
Design for manufacture review
You send
A STEP model, drawings with critical dimensions, material intentions and the surfaces your customer will see.
We do
Review draft, wall thickness, bosses, ribs, undercuts, parting lines, gating and ejection. Discuss features that drive tool complexity, finishing work or avoidable material use.
You receive
A DFM view: practical changes, open questions and a proposed manufacturing route, rather than an unexplained instruction to redesign.
APPROVAL GATE
Approve the changes and decide which features need physical evidence.
Risk avoided: Committing to tooling before the design can be made and inspected economically.
03SHEET 03 / 08 · REV A
Prototype & learn
You send
The revised model and a clear test question: fit, handling, assembly, appearance or functional behaviour.
We do
Use 3D printed form-and-fit parts where appropriate, or discuss an aluminium prototype tool when moulded material behaviour matters. Define the limitations of each sample before you test it.
You receive
Physical parts and an agreed understanding of what the test does and does not prove.
APPROVAL GATE
Accept the design or revise it before tool design begins.
Risk avoided: Treating a successful printed model as proof that a production moulded part will behave identically.
04SHEET 04 / 08 · REV B
Tool design sign-off
You send
The approved part revision, colour and finish intent, demand forecast and any assembly or inspection constraints.
We do
Specify the tool material, cavity approach, split, gating and ejection strategy. Reconcile cosmetic requirements with manufacturability and agree how samples will be judged.
You receive
An agreed tool specification tied to a controlled part revision and acceptance requirements.
APPROVAL GATE
Authorise the tool design and freeze the features that affect its construction.
Risk avoided: Late design changes that require rework after metal has been cut.
05SHEET 05 / 08 · REV B
Tool build
You send
Signed-off design information and confirmation that outstanding decisions have been resolved.
We do
Manage the tool build against the agreed specification. Aluminium can suit speed and lower volumes; steel can suit longer production life. UK-managed offshore build options can be considered for high-volume tools.
You receive
Progress against the agreed build scope and a plan for the first trial, with any issues surfaced for a decision.
APPROVAL GATE
Confirm readiness for trial rather than assuming a completed tool means production approval.
Risk avoided: Buying tool life you do not need, or selecting a tool unsuited to the intended material and demand.
06SHEET 06 / 08 · REV B
T1 samples & tool trials
You send
Your acceptance criteria, mating parts where necessary and the people responsible for sample review.
We do
Trial the tool and review the first moulded samples. Check fill, ejection, appearance and the specified dimensions; identify adjustments and distinguish tool issues from design issues.
You receive
T1 samples and a clear account of checks, changes and outstanding actions.
APPROVAL GATE
Accept the samples or agree corrections and another review.
Risk avoided: Approving by appearance alone while fit, critical dimensions or cosmetic surfaces remain unresolved.
07SHEET 07 / 08 · REV C
Pre-production & approval
You send
Sample feedback, final assembly requirements, packaging instructions and the proposed launch batch.
We do
Run an agreed pre-production stage to review repeatability, assembly and inspection requirements before scale-up. Confirm the approved revision and the instructions needed for consistent delivery.
You receive
Parts for final approval and a documented basis for production, including any agreed secondary operations.
APPROVAL GATE
Release production only when the acceptance requirements have been met.
Risk avoided: Scaling up an unproven process and discovering assembly or packaging problems across the launch batch.
08SHEET 08 / 08 · REV C
Production to delivery
You send
The released order, required delivery schedule, labels and packing details, plus call-off requirements if applicable.
We do
Mould the parts, carry out agreed secondary operations and assembly, inspect and pack. Agree call-off deliveries around your demand rather than assuming every launch needs all stock at once.
You receive
Approved finished parts with batch records and the agreed delivery and packing information.
APPROVAL GATE
Review supply performance and confirm the plan for repeat orders or revisions.
Risk avoided: A launch held up by unfinished components, unclear packing requirements or uncontrolled design changes.
03 / DESIGN REVIEW
Design for manufacture: the 8 things that cost founders money
A small CAD change can remove a large manufacturing complication. These details belong in the DFM conversation before rapid tooling or a production tool is commissioned.
DETAIL 01 / 08
Draft angles
Vertical faces need release from the mould. Too little draft can leave drag marks or make ejection difficult.
The fix. Add suitable taper early, considering depth, texture and the direction the tool opens. Agree functional faces that must remain controlled.
These are design principles, not universal dimensions. The polymer choice, geometry and intended use determine the final recommendation.
04 / PROCESS DECISION
Prototype or tool?
Choose evidence first, process second. A low volume injection moulding project can justify tooling when moulded behaviour matters; a printed prototype can be the better investment while the design is changing.
What you need to prove
A prototype is a question made physical. Separate shape and fit from strength, finish and repeatable production. Define the test, the acceptance criteria and the sample's limitations before choosing how to make it.
Demand matters too. Forecast the first batch and repeat orders honestly. More expensive tooling is not automatically better if the design or market is still unsettled.
ROUTE A / NO MOULD
3D printed prototypes
Proves: form, fit, handling and assembly access. Does not prove: identical moulded material behaviour, tool release or the final moulded surface. Move on when the design is stable and those production questions matter.
Proves: parts in a moulded polymer, tool trial behaviour and suitable lower-volume supply. Does not prove: unlimited tool life or suitability for every abrasive material. Move on when repeat demand and material requirements justify a longer-life tool.
Proves: an approved production route for the agreed material and volume. Does not prove: that a product will sell or that future design changes are free. Commit when the design, acceptance criteria and realistic demand support the investment.
Separate one-off development from repeat supply. An itemised quote makes the trade-offs visible without hiding the cost of bringing an assembled product to market.
QUALITATIVE COST STACK / ILLUSTRATIVE WIDTHS, NOT PERCENTAGES
Development
DFM and prototypes are driven by design readiness and the evidence needed before commitment.
Tooling
Part size, complexity, cavities, tool material and required life shape the investment.
Validation
Samples, trials and inspection depend on the approval requirements and unresolved issues.
Production
Material, cycle time, quantity and inspection requirements influence the repeat unit price.
Finished product
Secondary operations, assembly, packaging and labelling depend on the delivery specification.
State your target unit cost as context, not a promise the design can achieve it. Compare quotations on the same scope and quantity. A cheaper moulded part may not be a cheaper launch if assembly, inspection or packaging sits outside the price. Define secondary operations early.
06 / RELEASE CHECK
Is your brief ready for a production quote?
You do not need every answer to start a conversation. Mark what you have, identify the gaps and share a brief that separates confirmed requirements from assumptions.
0 / 12Brief items ready
Bring what you know. We can discuss the gaps.
PROJECT NOTE / THE VALUE OF EARLY DECISIONS
~30%faster launch cycle
Less backtracking. A clearer path to market.
Clients typically reduce their launch cycle by around 30%, based on the customer experience supplied for this page. It is not a schedule guarantee: readiness, complexity and timely approvals still determine your project. The point of the gates is to resolve expensive questions before they become tool changes.
Our ISO 9001 and ISO 14001 systems support a controlled route from prototype to production. Agree what success looks like at each gate, then judge the project against that plan.
07 / OPEN QUESTIONS
Product launch FAQs
Q01
How long does it take to go from prototype to injection moulded production?
Timing depends on design readiness, tool complexity, build route and the number of trial and approval rounds. A changing design takes a different path from a signed-off model. Share the target date early; we can identify the decisions on the critical path and agree a launch plan. The supplied start-up experience is not a lead-time guarantee.
Q02
What is the minimum order for injection moulding?
Batch size is agreed for the project, not imposed as a universal minimum. We work from one-off prototypes to 500,000+ parts a year, but tooling investment and unit economics determine whether moulding is sensible for your first batch. Share both your launch quantity and expected repeat demand so the recommendation reflects more than one order.
Q03
Should I 3D print or mould my first batch?
Print when the design is changing or the priority is form, fit and rapid learning. Discuss moulding when you need the chosen production polymer, a representative moulded finish or repeatable supply. An aluminium tool can bridge the gap. The decision should reflect what the batch must prove, not just the cheapest route to a physical object.
Q04
How do I protect my design with an NDA and who keeps the IP?
Ask for an NDA before sharing confidential design information. Define ownership, permitted use and the scope of work in the agreement; do not assume a file upload settles intellectual-property terms. Apex respects customer confidentiality and can discuss the information needed to review the project without publishing your design or naming your product.
Q05
Who owns the mould tool?
You own the tool once it is paid for. Apex can store and maintain it on your behalf. Agree its specification, ownership and ongoing arrangements alongside the quote so the launch plan includes what happens after the first production order, not only how the initial samples are made.
Q06
Can you help if my design is not ready for moulding?
Yes. A DFM review identifies issues such as draft, inconsistent walls, undercuts and difficult ejection before tool build. Send the current CAD and explain the function and features you cannot change. We will distinguish essential changes from trade-offs and agree what needs further design work or a prototype check before committing to tooling.
Q07
What is an aluminium prototype tool and when is it worth it?
It is a mould tool made in aluminium for prototypes, bridge production or suitable lower-volume runs. It can provide evidence in a moulded material that a printed part cannot. Aluminium is faster to machine but generally has less wear resistance than production steel. Its value depends on material, geometry and the realistic number of parts required.
Q08
Can you assemble and pack my product for launch?
Yes. Agree the scope for ultrasonic welding, pad printing, heat staking, bonding, assembly, inspection and packing as needed. Send mating components, work requirements, labels and packaging intentions with the brief. Defining these early helps avoid quoting a moulded component when the product you actually need is an assembled, ready-to-deliver item.
APEX / LAUNCH BRIEF / READY FOR REVIEW
Send your CAD (STEP), target launch date and first-year volume.
We’ll come back with a DFM view and a launch plan.